To assess the maturity of an existing project or set goal for the industry as a whole, different models for BIM maturity have evolved. Transforming an industry as fragmented as the construction industry is not done overnight. The BIMs (models) needs to be exchanged, networked or otherwise integrated to support decision making in the AECO processes.įor BIM to realize its full potential both the processes and the tools of the industry need to evolve. Menu BIM Levels and Asset Information Management 15 March 2016 on BIM, Facility Management, Maturity, Level 2, Level 3, Asset Information Model, PAS 1192, PAS1192-2, PAS 1192-3īIM (modelling) is the process of generating and managing virtual intelligent representations of buildings-to-be or buildings-as-operated.